Skip to content

From the author

Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/ri

Install

npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost -a claude-code

Installs to .claude/skills/gao-cost/ · Each command fetches the skill straight from GitHub with the open skills CLI.

No download: this skill’s licence (Custom or unclear) does not let us redistribute its files. The install commands fetch them from GitHub instead.

Want your agent to suggest skills while you type? See how to use skills from your IDE.

Safety checks on SKILL.md

  • Contains hidden text (invisible characters, long comments or encoded blobs)Medium

Why 70

Security80
Provenance64
Maintenance100
Licence45
Adoption35

aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.

Similar skills

Closest to this one by what they do and when they are used.

Ratings & reviews

—

no reviews

Tried this skill? Rate it to help others. Sign in

    Discussion

    Join the discussion. Sign in