Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/ri
Instalare
npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-cost -a claude-code
Se instalează în .claude/skills/gao-cost/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Fără descărcare: licența acestui skill (Personalizată sau neclară) nu ne permite să-i redistribuim fișierele. Comenzile de instalare le iau direct de pe GitHub.
Vrei ca agentul să-ți propună skill-uri în timp ce scrii? Vezi cum folosești skill-urile din IDE.
Verificări de siguranță pe SKILL.md
- Conține text ascuns (caractere invizibile, comentarii lungi sau blocuri codificate)Mediu
De ce 70
aiqbench calculează scorul de încredere din semnale publice. Nu este un audit de securitate, așa că citește un skill înainte să-l instalezi.
Skill-uri similare
Cele mai apropiate de acesta prin ce fac și când sunt folosite.
- gao-schedulejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.Altele★ 98
- nasa-cehjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the NASA Cost Estimating Handbook (CEH) v4.0. Use for NASA's 12-step, three-part cost estimating process (Project Definition, Cost Methodology, Cost Estimate); the WBS, CADRe, and ONCE data backbone; estimating methodologies (analogy, parametric/CER, engineering build-up, EVM, Delphi); ground rules and assumptions, data normalization and inflation (BY/CY/RY); the point-estimate-to-S-curve cost-risk chain and Unallocated Future Expense (UFE) reserves; Joint Cost and Schedule Confidence Level (JCL) analysis via probabilistic cost-loaded schedules; decision-support analyses (sensitivity, trade studies, make/lease-vs-buy, affordability, CAIV); and economic analysis (discounting, NPV, OMB Circular A-94). The cost-estimating complement to NASA's SE and risk packs. Does NOT reproduce the handbook's tool-specific procedures, worked examples, or appendix-depth methods (it names the appendices), nor cover full DoD/GAO cost guides, schedule construction, or formal risk management beyond the cost intePlanificare★ 98
- gao-trajgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Technology Readiness Assessment Guide (GAO-20-48G, 2020). Use for evaluating technology maturity in acquisition programs and projects: Technology Readiness Levels (TRL 1–9) and related scales (MRL, IRL), identifying Critical Technology Elements (CTEs), the five-step process for a high-quality TRA, the four characteristics of a reliable TRA (comprehensive, well-documented, credible, defensible), Technology Maturation Plans (TMPs), and using TRA results in knowledge-based, milestone decisions. Assessment/maturity oriented: it measures readiness and frames risk — it is not a full SE process model, cost-estimating, or schedule guide (see sibling packs for those).Planificare★ 98
- gao-agilejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Agile Assessment Guide (GAO-24-105506, 2023). Use for assessing and managing Agile software development in federal programs: the Agile Manifesto and framework family (Scrum, Kanban, XP, SAFe, DA, DSDM, Lean, DevOps); the three adoption perspectives (team dynamics, program operations, organization environment); requirements decomposition (epics, features, user stories, INVEST, MoSCoW, definition of done); Agile-aware federal contracting (FAR, modular contracting, SOO/PWS/SOW, product owner vs. COR); program monitoring and control (WBS, cost, schedule, EVM at the feature level); Agile metrics (velocity, lead/cycle time, CFD, burn charts); and the auditor's key-question bank. Oversight- and acquisition-oriented: it tells you how to *assess and govern* Agile programs, not how to code. Thin on hands-on engineering practice, deep cost/schedule checklists (see gao-cost, gao-schedule), and any non-US-federal context.DevOps★ 98
- software-cost-estimatorBlackBeltTechnology/pi-agent-dashboardEstimate developer cost and effort for a set of use cases, functional and non-functional requirements on a given technology stack. Produces an architecture plan, a role-resolved man-hour estimate with P50/P85/P95 ranges, a side-by-side comparison of four delivery modes (human only, human + AI, AI-steered human-supervised, agentic HITL), and a business case with NPV/ROI/payback/TCO and a must-should-could scope ladder. Use when the user asks "how much would this cost to build", "estimate this project", "how many man-days", "make an offer/quote", "what would it cost with AI vs without", "build a business case for this feature", or wants to size a backlog, an RFP response, or a change request.Planificare★ 340
- nist-stat-handbookjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the NIST/SEMATECH e-Handbook of Statistical Methods (NIST HB 151) — the practical statistics reference for engineering, metrology, and quality. Use for: exploratory data analysis and the four univariate assumptions (4-plot); measurement process characterization including bias/precision, calibration designs, gauge R&R, and ISO/GUM uncertainty budgets; production process characterization (stability vs. capability); process modeling and regression (LS/WLS/NLS/LOESS); design of experiments (screening, fractional/factorial, response-surface, Taguchi); statistical process control (Shewhart/CUSUM/EWMA charts, capability indices, acceptance sampling); product/process comparisons (hypothesis tests and confidence intervals for 1/2/3+ groups, ANOVA, multiple comparisons); and reliability (lifetime & repair-rate models, accelerated testing, reliability growth). Scope limits: this is applied frequentist statistics for measurement and quality — it does NOT reproduce the per-distribution formula gallerieTestare★ 98
Note și recenzii
—
nicio recenzie
Ai încercat acest skill? Notează-l ca să-i ajuți pe alții. Autentifică-te
Discuție
Intră în discuție. Autentifică-te