From the author
Knowledge base from the GAO Technology Readiness Assessment Guide (GAO-20-48G, 2020). Use for evaluating technology maturity in acquisition programs and projects: Technology Readiness Levels (TRL 1–9) and related scales (MRL, IRL), identifying Critical Technology Elements (CTEs), the five-step process for a high-quality TRA, the four characteristics of a reliable TRA (comprehensive, well-documented, credible, defensible), Technology Maturation Plans (TMPs), and using TRA results in knowledge-based, milestone decisions. Assessment/maturity oriented: it measures readiness and frames risk — it is not a full SE process model, cost-estimating, or schedule guide (see sibling packs for those).
Install
npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-tra -a claude-code
Installs to .claude/skills/gao-tra/ · Each command fetches the skill straight from GitHub with the open skills CLI.
No download: this skill’s licence (Custom or unclear) does not let us redistribute its files. The install commands fetch them from GitHub instead.
Want your agent to suggest skills while you type? See how to use skills from your IDE.
Safety checks on SKILL.md
- Contains hidden text (invisible characters, long comments or encoded blobs)Medium
Why 70
aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.
Similar skills
Closest to this one by what they do and when they are used.
- gao-costjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/riPlanning★ 98
- mrl-deskbookjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the Manufacturing Readiness Level (MRL) Deskbook (Version 2025, 1 May 2025, OSD ManTech / Joint Service/Industry MRL Working Group). Use for manufacturing maturity and producibility risk in defense acquisition: ten-level MRL scale (target, not grade); demonstration environments; nine Section 2.4 threads; Adaptive Acquisition Framework pathway targets; assessment-to-MMP loop; contract language (Section L/M, SOW, AS6500A, DIDs); criteria adaptation for S and T, sustainment and depot, limited systems including ships, and industry gates; and OT cybersecurity screening inside an assessment. Manufacturing-readiness focused: it measures producibility risk and frames mitigation; it is not a technology-readiness (TRL) guide, not a full systems-engineering process model, not a cost-estimating or schedule guide, and not a deep cybersecurity audit method (see sibling packs for those).Legal★ 98
- gao-schedulejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.Other★ 98
- digital-maturity-assessmentdatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionAssess organization's digital transformation readiness. Evaluate data culture, technology adoption, and process maturity.Other★ 391
- code-maturity-assessortrailofbits/skillsSystematic code maturity assessment using Trail of Bits' 9-category framework. Analyzes codebase for arithmetic safety, auditing practices, access controls, complexity, decentralization, documentation, MEV risks, low-level code, and testing, then produces a scorecard with evidence-based ratings and a priority-ordered roadmap. Use when assessing or scoring the maturity of a smart contract or blockchain codebase, producing a maturity scorecard or evaluation, or judging how mature, well-tested, or well-documented such a project is against a rubric.Engineering★ 8K
- ai-readiness-assessmentOneWave-AI/claude-skillsAssesses how ready a business is for AI adoption across six dimensions. Evaluates data maturity, tech stack, team skills, process documentation, budget, and culture. Generates a comprehensive ai-readiness-report.md with scores, gap analysis, and recommended starting points. Aligned with OneWave AI's audit methodology.Other★ 412
Ratings & reviews
—
no reviews
Tried this skill? Rate it to help others. Sign in
Discussion
Join the discussion. Sign in