gao-schedule
From the author
Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.
Install
npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill gao-schedule -a claude-code
Installs to .claude/skills/gao-schedule/ · Each command fetches the skill straight from GitHub with the open skills CLI.
No download: this skill’s licence (Custom or unclear) does not let us redistribute its files. The install commands fetch them from GitHub instead.
Want your agent to suggest skills while you type? See how to use skills from your IDE.
Safety checks on SKILL.md
- Contains hidden text (invisible characters, long comments or encoded blobs)Medium
Why 70
aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.
Similar skills
Closest to this one by what they do and when they are used.
- gao-costjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/riPlanning★ 98
- nasa-schedulejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on thTesting★ 98
- gao-agilejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Agile Assessment Guide (GAO-24-105506, 2023). Use for assessing and managing Agile software development in federal programs: the Agile Manifesto and framework family (Scrum, Kanban, XP, SAFe, DA, DSDM, Lean, DevOps); the three adoption perspectives (team dynamics, program operations, organization environment); requirements decomposition (epics, features, user stories, INVEST, MoSCoW, definition of done); Agile-aware federal contracting (FAR, modular contracting, SOO/PWS/SOW, product owner vs. COR); program monitoring and control (WBS, cost, schedule, EVM at the feature level); Agile metrics (velocity, lead/cycle time, CFD, burn charts); and the auditor's key-question bank. Oversight- and acquisition-oriented: it tells you how to *assess and govern* Agile programs, not how to code. Thin on hands-on engineering practice, deep cost/schedule checklists (see gao-cost, gao-schedule), and any non-US-federal context.DevOps★ 98
- schedule-development-and-analysiscbrock84/headcountBuilds and interrogates a project schedule — logic-driven sequencing, dependency types and lags, float and the critical path, resource loading and leveling, schedule risk analysis, and measuring progress against a baseline rather than against optimism. Use this to construct a schedule, audit one you have inherited, find out why a plan keeps slipping, work out what a date change actually costs, or judge whether a reported percentage complete means anything.Planning★ 2.6K
- gao-trajgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the GAO Technology Readiness Assessment Guide (GAO-20-48G, 2020). Use for evaluating technology maturity in acquisition programs and projects: Technology Readiness Levels (TRL 1–9) and related scales (MRL, IRL), identifying Critical Technology Elements (CTEs), the five-step process for a high-quality TRA, the four characteristics of a reliable TRA (comprehensive, well-documented, credible, defensible), Technology Maturation Plans (TMPs), and using TRA results in knowledge-based, milestone decisions. Assessment/maturity oriented: it measures readiness and frames risk — it is not a full SE process model, cost-estimating, or schedule guide (see sibling packs for those).Planning★ 98
- production-schedulingmturac/everything-openai-codexCodified expertise for production scheduling, job sequencing, line balancing, changeover optimization, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years experience. Includes TOC/drum-buffer-rope, SMED, OEE analysis, disruption response frameworks, and ERP/MES interaction patterns. Use when scheduling production, resolving bottlenecks, optimizing changeovers, responding to disruptions, or balancing manufacturing lines.Other★ 83
Ratings & reviews
—
no reviews
Tried this skill? Rate it to help others. Sign in
Discussion
Join the discussion. Sign in