cost-estimation-resource
datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction ↗
From the author
Calculate construction costs using resource-based method. Estimate project costs from work items, physical resource norms, and current prices.
Install
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill cost-estimation-resource -a claude-code
Installs to .claude/skills/cost-estimation-resource/ · Each command fetches the skill straight from GitHub with the open skills CLI.
Byte-identical to the scanned commit, with the repository’s licence and a SOURCE.txt.
Want your agent to suggest skills while you type? See how to use skills from your IDE.
Safety checks on SKILL.md
No warnings.
Why 86
aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.
Similar skills
Closest to this one by what they do and when they are used.
- estimate-builderdatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionBuild construction project estimates. Generate detailed cost breakdowns with labor, materials, equipment, and overhead.Other★ 368
- cwicr-cost-calculatordatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionCalculate construction costs using DDC CWICR resource-based methodology. Break down costs into labor, materials, equipment with transparent pricing.Other★ 368
- labor-ratedatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionCalculate construction labor rates with overhead, benefits, and productivity factors. Regional rate databases and crew composition.Other★ 368
- open-construction-estimatedatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionAccess and utilize open construction pricing databases. Match BIM elements to standardized work items, calculate costs using public unit price databases with 55,000+ work items.Other★ 368
- co2-estimationdatadrivenconstruction/DDC_Skills_for_AI_Agents_in_ConstructionCalculate carbon footprint of construction projects. Estimate CO2 emissions from materials, transportation, and construction processes using emission factors databases.Other★ 368
- estimating-and-contingencycbrock84/headcountProduces a cost or effort estimate someone can defend — decomposing the work, choosing between analogous, parametric and bottom-up methods, documenting the basis and its assumptions, expressing confidence as a range, and sizing contingency and management reserve separately. Use this to build an estimate, challenge one you have been handed, work out why estimates keep coming in low, or decide how much reserve a portfolio actually needs.Other★ 2.1K
Ratings & reviews
—
no reviews
Tried this skill? Rate it to help others. Sign in
Discussion
Join the discussion. Sign in