Agent skills you can check before you install
Public SKILL.md skills from GitHub repositories with 50+ stars and from the vendors themselves, scanned and scored. Install any of them with one command in Claude Code, Cursor, Codex, GitHub Copilot or Gemini CLI.
49,493 skills from 2,407 repositories · updated 32 minutes ago
48,409 skills
- nejm-citationbrycewang-stanford/Awesome-Journal-SkillsUse to convert references to NEJM's Vancouver / ICMJE numbered style — numbered in order of appearance, limited author lists then et al., NLM journal abbreviations, and a capped reference count. Late-stage style pass.OtherNo warnings★ 1.4K↓ —
- mind-workflowbrycewang-stanford/Awesome-Journal-SkillsUse as the entry point for any Mind (philosophy journal) article. Routes to the right Mind sub-skill based on where you are in the lifecycle and whether the piece is an article, discussion note, book review, or critical notice. Mind is analytic philosophy — argument, not data — so the router's first job is to confirm there is a sharp thesis and a sound argument. It dispatches; it does not draft content.ProductivityNo warnings★ 1.4K↓ —
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ScienceNo warnings★ 1.4K↓ —
- nejm-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the NEJM structured abstract — four headed sections (Background, Methods, Results, Conclusions), ≤250 words, with the trial registration number and funding source, leading the Results with the primary outcome reported as an effect size with a 95% CI. Late-stage polish skill.WritingNo warnings★ 1.4K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivityNo warnings★ 1.4K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivityNo warnings★ 1.4K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivityNo warnings★ 1.4K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivityNo warnings★ 1.4K↓ —
- pcbwayhashgraph-online/awesome-codex-pluginsPCBWay PCB fabrication and assembly — turnkey/consigned assembly, design rules, ordering workflow. Alternative to JLCPCB for manufacturing. Use with KiCad. Use this skill when the user mentions PCBWay, needs turnkey assembly (PCBWay sources parts by MPN), has parts not available on LCSC, needs assembled boards with non-LCSC components, wants to compare PCBWay vs JLCPCB, or needs assembly with parts sourced globally rather than from LCSC only. For gerber/CPL export, stencil ordering, and BOM management, see the `bom` skill.DesignNo warnings★ 1.5K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivityNo warnings★ 1.4K↓ —
- imc-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.ScienceNo warnings★ 1.4K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivityNo warnings★ 1.4K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivityNo warnings★ 1.4K↓ —
- write-outreach-outreach-qagooseworks-ai/goose-skillsStep of the write-outreach playbook: the checks a finished outreach pack and send file must pass before delivery, covering facts, proof, compliance, length, asks and tone. Run write-outreach instead; not for direct use.TestingNo warnings★ 1.3K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivityNo warnings★ 1.4K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivityNo warnings★ 1.4K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivityNo warnings★ 1.4K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivityNo warnings★ 1.4K↓ —
- second-brain-graphundefined-ui/second-brain-osAnalyse the vault's link graph and report on its shape: orphan rate, average degree, components, hubs, bridges and clusters, with what each number means for retrieval. Use this skill when the user asks about the health or structure of their graph, wants metrics, asks which pages are most connected or most isolated, or asks whether the vault is fragmented. Do NOT use for fixing what it finds, which is second-brain-lint, or for answering a content question.OtherNo warnings★ 1.4K↓ —
- roastalirezarezvani/claude-skillsRoast an idea: a 5-angle panel (Critic, Champion, Analyst, Investigator, Customer) attacks it, then a Judge returns one GO / RESHAPE / KILL verdict with the cheapest test to de-risk it. Use whenever the user wants to pressure-test or validate a business idea, asks for a brutal second opinion before building, asks is this a good idea, says convene the panel, or runs /roast.TestingNo warnings★ 29.3K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumentsNo warnings★ 1.4K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivityNo warnings★ 1.4K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignNo warnings★ 1.4K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivityNo warnings★ 1.4K↓ —
cn-5s-audit
mohitagw15856/pm-claude-skills
From the author
Use when asked 5S 检查表, 6S 管理, 现场管理检查, 5S 评分标准, 车间 6S 稽核, 做一份 5S 推行计划, or design a 5S or 6S audit for a workshop, warehouse or office in a Chinese factory. Produces an audit checklist for the area with scored criteria for 整理, 整顿, 清扫, 清洁, 素养 (and 安全 for 6S), a scoring guide with photo evidence rules, a results summary and red-tag list, a corrective-action tracker with owners and dates, and an audit rota, in Chinese.
Install
npx skills add mohitagw15856/pm-claude-skills --skill cn-5s-audit -a claude-code
Installs to .claude/skills/cn-5s-audit/ · Each command fetches the skill straight from GitHub with the open skills CLI.
Byte-identical to the scanned commit, with the repository’s licence and a SOURCE.txt.
What it can touch
Safety checks on SKILL.md
No warnings.
Why 88
Files (1)
- SKILL.md