nasa-systems-modeling
From the author
Knowledge base from the NASA Systems Modeling Handbook for Systems Engineering (NASA-HDBK-1009A Rev A, 2025). Use for model-based systems engineering (MBSE) wired into NASA's NPR 7123.1 SE processes: the three aspects of MBSE (language / methodology / framework), the NASA SE Engine and its two OOSEM-derived steps (Model Planning, Setting Up the Model), the Modeling Plan as a SEMP subset, the tool-agnostic NASA SE metamodel of elements and relationships across the four SysML pillars (structure / behavior / requirements / parametrics), worked SysML diagrams and tables for stakeholders, requirements, structure and V&V, generating SE work products (ConOps, MOE, MOP, TPM, V&V), the MBSE Grid framework, alternative modeling approaches (PBR, Scenario, System Specification, Verification), and the ConOps model-content template. Scope is bounded to four common technical processes (Stakeholder Expectation Definition, Technical Requirements Definition, Product Verification, Product Validation). Does NOT teach SysML itsel
Install
npx skills add jgsystemsconsulting/jgs-se-knowledge-packs --skill nasa-systems-modeling -a claude-code
Installs to .claude/skills/nasa-systems-modeling/ · Each command fetches the skill straight from GitHub with the open skills CLI.
No download: this skill’s licence (Custom or unclear) does not let us redistribute its files. The install commands fetch them from GitHub instead.
Want your agent to suggest skills while you type? See how to use skills from your IDE.
Safety checks on SKILL.md
- Contains hidden text (invisible characters, long comments or encoded blobs)Medium
Why 70
aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.
Similar skills
Closest to this one by what they do and when they are used.
- nasa-npr-7123jgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from NASA NPR 7123.1D — Systems Engineering Processes and Requirements. Use for the 17 common SE processes (SE Engine), life-cycle reviews and entrance/success criteria, SEMP structure and content, ETA roles and tailoring/customizing rules, Technology Readiness Levels (TRL 1–9), SE work product maturity terminology, contracted project oversight, and MOE/MOP/TPM measurement frameworks. Does not cover NASA programme financial management, human spaceflight medical standards, or software engineering requirements in depth (see NPR 7150.2 for the latter).Science★ 98
- nasa-se-handbookjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the NASA Systems Engineering Handbook (NASA/SP-2016-6105 Rev 2). Use for NASA's systems-engineering process model — the SE Engine and 17 common technical processes, the program/project life cycle (Pre-Phase A through F), Key Decision Points and technical reviews (MCR/SRR/PDR/CDR/…), stakeholder expectations, technical requirements, design solution, product verification and validation, and crosscutting technical management (planning, risk, configuration, interfaces, data, assessment, decision analysis). Strong for aerospace/spaceflight project SE and lifecycle gating; NASA-specific terminology (KDPs, NPR 7123.1).Design★ 98
- nasa-se-expandedjgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the Expanded Guidance for NASA Systems Engineering (NASA/SP-2016-6105-SUPPL, Volume 1, March 2016) — the practitioner-depth supplement to the NASA SE Handbook. Use for the load-bearing mechanics the handbook compresses: the SE Engine's per-phase cadence and the iterative-vs-recursive distinction, the AS9100 crosswalk, life-cycle tailoring vs. customization and the Compliance Matrix, the recursive system-design consistency loop (ConOps vs. Operations Concept, requirement flow/type/ownership, successive refinement), product realization (verify/qualify/accept/certify cardinality, protoflight, 'test the way we fly' coverage, two-form transition), and the crosscutting technical-management procedures (six-step scheduling, cost-estimating method selection, JCL, interface document family, RIDM/CRM, CM baselines, EVM arithmetic, MOE/MOP/KPP/TPM, the three required leading indicators, and the decision-analysis method catalog). This is the DEPTH layer — it deliberately does NOT restate the base definTesting★ 98
- nasa-npr-7150jgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from NASA NPR 7150.2D — NASA Software Engineering Requirements. Use for NASA's Agency-wide software-engineering requirements: the software classification scheme (Classes A–F), the Requirements Mapping Matrix and class-driven applicability, tailoring and Technical Authority governance, the SWE-### 'shall' requirements across software management (Ch 3) and the engineering life cycle (Ch 4), the supporting disciplines (configuration management, risk, peer reviews/inspections, measurement, non-conformance — Ch 5), safety-critical and cybersecurity requirements, IV&V applicability, traceability, and the Appendix A definitions. Does not cover detailed software-assurance/safety procedures (see NASA-STD-8739.8), implementation how-to and document content (see NASA-HDBK-2203), the systems-engineering process framework (see NPR 7123.1), or program/project management (see NPR 7120.5).Planning★ 98
- nasa-se-methodologyTibsfox/gsd-skill-creatorNASA Systems Engineering methodology mapped to cloud operations. Use when planning, executing, verifying, or documenting OpenStack cloud infrastructure following NASA SP-6105 and NPR 7123.1 processes. Provides phase gate criteria, document templates, and cross-references for all 7 SE lifecycle phases applied to cloud deployment and operations.DevOps★ 71
- nasa-schedulejgsystemsconsulting/jgs-se-knowledge-packsKnowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on thTesting★ 98
Ratings & reviews
—
no reviews
Tried this skill? Rate it to help others. Sign in
Discussion
Join the discussion. Sign in