content-spark
From the author
This skill should be used when a story has been captured but content direction is unresolved - the spark describes WHAT to build structurally but not WHAT goes in it. Reads the story spark, splits it into Resolved (structurally clear) vs. Assumed (would have to guess) content dimensions, and surfaces each assumption for the human to confirm, correct, or expand. Also classifies implementation risk tags (has-variants, has-data-pipeline, has-animation, has-touch-targets, diverges-from-existing) so plan-chunks translates them into acceptance criteria that name the implementation mechanism. Captures answers into
Install
npx skills add drobins25/craft --skill content-spark -a claude-code
Installs to .claude/skills/content-spark/ · Each command fetches the skill straight from GitHub with the open skills CLI.
Byte-identical to the scanned commit, with the repository’s licence and a SOURCE.txt.
Want your agent to suggest skills while you type? See how to use skills from your IDE.
Safety checks on SKILL.md
No warnings.
Why 82
aiqbench computes the trust score from public signals. It is not a security audit, so read a skill before you install it.
Similar skills
Closest to this one by what they do and when they are used.
- plan-chunksdrobins25/craftThis skill should be used when the user asks to "plan chunks", "break this down", "plan the implementation", or when a story has status planning and needs implementation details before building. Required before any story can be implemented. Transforms story sparks into detailed chunk-by-chunk implementation plans with full technical specifics, file lists, and risk analysis. Supports parallel planning of multiple stories via batch mode.Planning★ 70
- sparktance-mang/chinese-webnovel-skills中文网文灵感记录与一键成稿。当用户冒出一个灵感/点子想随手记下来、想把灵感本里的某个点子孵化成大纲或初稿、或说"就这一个想法帮我写出来"时使用。支持灵感速记、一个灵感→大纲→初稿全流程,可设定总字数/单章字数并自动分章节。Other★ 94
- plot-structuredanjdewhurst/story-skillsThis skill should be used when the user asks to "create a plot arc", "story structure", "add a plot point", "story timeline", "track foreshadowing", "pacing", "sagging middle", "act structure", "story arc", "plot outline", "snowflake method", or wants to plan and manage the narrative structure of a story. It owns book-level pacing; NOT for the craft of scene outcomes or chapter hooks, which this skill only plans in the outline (use scene-craft), or a pacing check as a revision pass (use revision-continuity).Data★ 372
- creative-sparkdrobins25/craftThis skill should be used when the user asks to "brainstorm", "explore options", "get creative", "what if we...", or selects "Let's get creative" during story or cycle creation. NOT for a bare vague feature idea where generating options would mean inventing the premise first - that routes to /craft:riff (riff first, options after). Generates 3-4 creative options with trade-offs, visual direction for UI stories, and wireframes.Design★ 70
- content-strategycoreyhaines31/marketingskillsWhen the user wants to plan a content strategy, decide what content to create, or figure out what topics to cover. Also use when the user mentions "content strategy," "what should I write about," "content ideas," "blog strategy," "topic clusters," "content planning," "editorial calendar," "content marketing," "content roadmap," "what content should I create," "blog topics," "content pillars," or "I don't know what to write." Use this whenever someone needs help deciding what content to produce, not just writing it. For writing individual pieces, see copywriting. For SEO-specific audits, see seo-audit. For social media content specifically, see social.Marketing★ 57.6K
- product-discoverynahid-sparktales/agent-dispatcherFind the real problem behind a feature request before anyone scopes a solution — whose job is stuck, what evidence exists already, and what observation would prove the assumption wrong. Use when a request arrives phrased as a solution ("add a dashboard", "we need notifications"), when a team is about to build on a belief nobody has checked, or when asked whether something is worth building at all. Not for writing the spec once the problem is settled, not for ranking work that is already understood, and never a licence to contact users without permission.Writing★ 59
Ratings & reviews
—
no reviews
Tried this skill? Rate it to help others. Sign in
Discussion
Join the discussion. Sign in