aiqbench analysis
This paper argues that training a prognostic model to minimize its own statistical error (MSE or KL divergence) can lead to worse maintenance decisions than training it to minimize maintenance cost directly. The authors report that their Integrated Estimate-Optimize approach cuts maintenance cost by 7 to 23% on CMAPSS benchmarks, even though its prediction errors are higher. For ML practitioners, the useful takeaway is that decision-aware training objectives can matter more than predictive accuracy when downstream costs are asymmetric, though the results rest on simulated benchmark data and specific theoretical conditions.
Data-Driven Maintenance Optimization: Aligning Prognostic Learning with Decision Objective
arXiv:2506.19698v2 Announce Type: replace Abstract: Estimation error in machine learning prognostic models can propagate into poor maintenance decisions. We study a data-driven predictive maintenance problem coupling health-condition estimation with a joint ordering-replacement model. We show that the conventional Estimate-Then-Optimize (ETO) approach yields inconsistent, suboptimal decisions for a broad class of such problems. To bridge the gap, we propose an Integrated Estimate-Optimize (IEO) framework that directly targets maintenance cost as the prognostic learning objective, bypassing surrogate statistical accuracy metrics such as Kullback--Leibler divergence or mean squared error. Theoretically, we prove out-of-sample performance guarantees of the IEO framework under certain conditions, including i.i.d. and sliding-window data-generating processes. Computationally, we develop a training procedure combining Monte Carlo dropout, central-difference gradient approximation, and an ETO warm-start to handle discrete maintenance decisions and nonlinear costs. Experiments on the four CMAPSS subsets demonstrate that, under the nominal setting, IEO reduces mean maintenance cost by 14.8--22.7% relative to ETO and by 7.2--11.8% relative to a decision-oriented baseline, while also reducing failure rates and cost variation. These improvements are obtained despite higher prediction errors. Increasing the ratio of unplanned-downtime costs to planned-downtime costs makes this tradeoff more pronounced: IEO shifts predictions further toward RUL underestimation, accompanied by greater cost savings and fewer failures. These findings support aligning prognostic learning with maintenance objectives when imperfect predictions must guide decisions under costly unplanned downtime.
Abstract:Estimation error in machine learning prognostic models can propagate into poor maintenance decisions. We study a data-driven predictive maintenance problem coupling health-condition estimation with a joint ordering-replacement model. We show that the conventional Estimate-Then-Optimize (ETO) approach yields inconsistent, suboptimal decisions for a broad class of such problems. To bridge the gap, we propose an Integrated Estimate-Optimize (IEO) framework that directly targets maintenance cost as the prognostic learning objective, bypassing surrogate statistical accuracy metrics such as Kullback--Leibler divergence or mean squared error. Theoretically, we prove out-of-sample performance guarantees of the IEO framework under certain conditions, including i.i.d. and sliding-window data-generating processes. Computationally, we develop a training procedure combining Monte Carlo dropout, central-difference gradient approximation, and an ETO warm-start to handle discrete maintenance decisions and nonlinear costs. Experiments on the four CMAPSS subsets demonstrate that, under the nominal setting, IEO reduces mean maintenance cost by 14.8--22.7% relative to ETO and by 7.2--11.8% relative to a decision-oriented baseline, while also reducing failure rates and cost variation. These improvements are obtained despite higher prediction errors. Increasing the ratio of unplanned-downtime costs to planned-downtime costs makes this tradeoff more pronounced: IEO shifts predictions further toward RUL underestimation, accompanied by greater cost savings and fewer failures. These findings support aligning prognostic learning with maintenance objectives when imperfect predictions must guide decisions under costly unplanned downtime.
Artificial Intelligence (cs.AI); Optimization and Control (math.OC)
arXiv:2506.19698 [cs.AI]
(or arXiv:2506.19698v2 [cs.AI] for this version)
https://doi.org/10.48550/arXiv.2506.19698 Focus to learn more arXiv-issued DOI via DataCite
arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.
Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.
Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.
Full text under the publisher's open licence · 315 words
Related coverage

SkyWater and D-Wave Extend Quantum Manufacturing Partnership Through Multi-Year Agreement
Quantum Computing Report · Oct 14, 2026
Graph-Based Inference and Topology-Aware Multi-Agent Reinforcement Learning for Large-Scale Railway Network Management
arXiv · Sep 26, 2026

SkyWater and D-Wave Sign Multi-Year Quantum Manufacturing Agreement
The Quantum Insider · Oct 13, 2026
SkillCT: A Multidimensional Benchmark and Execution-Free Baseline for Agent Skill Assessment
arXiv · Oct 31, 2026