Governance Synthesis: Impact Assessment Practice
You'll be able to:
You can run an end-to-end AI Impact Assessment on a real product — mapping intended use, affected populations, harms, mitigations, monitoring — and turn its output into shippable decisions.
An impact assessment is completed, filed, and referenced once at launch. It identified four risks and proposed mitigations for each. None were implemented, because the document ended where it should have started — with findings rather than with owned, scheduled, testable work. An assessment that does not terminate in backlog items is a description of risk, not a treatment of it.
The structure that produces decisions
Intended use, and foreseeable misuse. What the system is for, and what people will predictably do with it that you did not intend. The second half is where most real risk sits, and skipping it is the most common weakness.
Affected populations, including non-users. Everyone whose situation changes because the system exists. A screening tool affects rejected applicants, who are not users and have the strongest interest in its behaviour. Assessments that consider only users systematically miss the people bearing the harm.
Harms, characterised rather than listed. For each: who is affected, how severe, how likely, is it reversible, and can the affected person detect and contest it. Severity and reversibility together determine priority far better than likelihood alone, because a rare irreversible harm usually outranks a frequent recoverable one.
Mitigations, owned and dated. Each with a named owner and a delivery date, and a note where the mitigation is partial. Mitigations without owners do not happen.
Monitoring. Which metric, at what threshold, reviewed by whom, and what action the threshold triggers. This is where assessments most often stop being real, because it requires ongoing commitment rather than a document.
Residual risk, accepted explicitly. What remains after mitigation, and who accepted it by name. Unstated residual risk is accepted by default and by nobody.
Turning findings into shippable work
The conversion is mechanical and it is the step that gets skipped. Each mitigation becomes a backlog item with an owner and acceptance criteria. Each monitoring commitment becomes an alert with a threshold and a route. Each accepted residual risk becomes a documented decision with a named accepter and a review date.
A finding with no ticket will not be actioned. This is not a process preference; it is what reliably happens, and it is why assessments that produce documents rather than backlog changes have no measurable effect on shipped systems.
Timing determines usefulness
Run at design, an assessment changes architecture cheaply. Run before launch, it can only accept or delay. Run after, it documents. The same work produces entirely different value depending on when it happens, and the instinct to schedule it as a pre-launch gate is what makes it theatre.
Failure modes
Findings without tickets — risks identified, no work created. Signal: mitigations in a document and nowhere in the tracker.
Users only — non-user affected populations unconsidered. Signal: no analysis of people the system decides about but who never use it.
Monitoring unassigned — metrics named, no owner or threshold. Signal: an alert nobody receives.
Residual risk implicit — nothing stated, so nothing accepted deliberately. Signal: no named accepter for any known limitation.
Explaining this to stakeholders
On timing: the same assessment is a design input in March and a formality in September. Nothing about the work changes, only what we can still do about it.
On non-users: the people most affected by a screening system are the ones it rejects, and they never log in. If we only consider users, we have excluded exactly the population at risk.
On residual risk: some risk will remain, and that is acceptable. What is not acceptable is nobody having said so, because then no one has decided anything and no one is accountable.
Check Yourself
Module Mission
30–45 minChoose a product feature launching in your organisation (or a hypothetical). Produce a one-page AIA covering: purpose, stakeholders, harms ranked by severity, reversibility and likelihood, mitigations, residual risk, sign-off.
Loading your work…
Curated Materials
1.4hThe deep work happens here — the lesson is your briefing.
Live on aiqbench
This lesson's subject on the rest of the site, today.
In the news, last 30 days
- Kosli launches Control Center to automate enterprise SDLC governance with real-time policy checksDealroom.co ·
- S&P Discovers Nvidia's Governance LapsesDealroom.co ·
- Recap of Microsoft Ignite 2026: Copilot as the Work OS and Agent GovernanceInfoQ ·