Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.399 de skill-uri din 2.375 de depozite · actualizat acum 20 de minute
48.352 de skill-uri
- dac-camera-readybrycewang-stanford/Awesome-Journal-SkillsUse when preparing the final ACM/IEEE Design Automation Conference (DAC) Research-Manuscript camera-ready after acceptance, covering de-anonymization, restoring author/affiliation/acknowledgement/funding blocks, the ACM copyright form and rights stamp, the April proceedings deadline, ACM Digital Library metadata and archival-flow checks, and the still-fixed 6+1 page budget.DesignFără avertismente★ 1,4 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
- imc-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- redis-semantic-cacheredis/agent-skillsRedis LangCache guidance for semantic caching of LLM responses on Redis Cloud — calling search/set via the SDK or REST API, tuning the similarity threshold, separating caches per task type, and filtering with custom attributes. Use when caching LLM completions or RAG answers to cut API cost and latency, building a cache-aside layer in front of OpenAI / Anthropic / etc., tuning hit rate vs precision, or splitting one app's LLM workloads into multiple LangCache caches.OficialInginerieFără avertismente★ 172↓ —Apare și în 1 alt depozit
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivitateFără avertismente★ 1,4 K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignFără avertismente★ 1,4 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
- model-mixhoangsonww/Claude-Code-Agent-MonitorBreak down Claude Code usage by model family (Opus / Sonnet / Haiku) from the Agent Monitor dashboard — each family's share of tokens, share of cost, and the spots where an expensive model is doing cheap work. Pulls per-model token and cost splits from /api/pricing/cost, current rates from /api/pricing, fleet token totals from /api/analytics, and per-session model assignment from /api/sessions. Use when deciding model routing or whether to downshift work to a cheaper tier.DateFără avertismente★ 1,1 K↓ —
- release-commshuytieu/COG-second-brainRelease communication pipeline for your product: turn a deployment runsheet and a GitHub milestone into a customer-facing release note with real screenshots and videos, docs updates (including retrofits of articles the release makes stale), a Slack announcement draft, and a lightweight marketing package. Use when you say "cover today's release", "write the release note", or "/release-comms".DevOpsFără avertismente★ 1,3 K↓ —Apare și în 1 alt depozit
- implementhashgraph-online/awesome-codex-pluginsChange or repair code, config or services without weakening tests; report what ran and what did not. Use when: implementing a change or fixing a defect.TestareFără avertismente★ 1,5 K↓ —Apare și în 2 alte depozite
- cikm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a CIKM project calendar across the May abstract/paper gates, June short-track gates, August notification and camera-ready, and the November conference, including the post-submission phase now live in the 2026 cycle, multi-track coordination, and fallback planning toward CIKM 2027 or sibling venues.ProductivitateFără avertismente★ 1,4 K↓ —
- colm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLM submission campaign across the calendar — working backward from the late-March abstract and paper deadlines through the May-June rebuttal, July decisions, August camera-ready, and October conference, coordinating co-authors, compute, and reciprocal-reviewing duties, and slotting COLM into a multi-venue LM-research pipeline.ProductivitateFără avertismente★ 1,4 K↓ —
- colt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLT (Conference on Learning Theory) submission calendar backward from the single AoE paper deadline — proof-completion and verification milestones, writing and appendix-assembly passes, CMT logistics, the rebuttal window, decision aftermath, and PMLR camera-ready with conference presentation in early summer.ProductivitateFără avertismente★ 1,4 K↓ —
- cost-reporthoangsonww/Claude-Code-Agent-MonitorProduce a scoped CCAM cost and token report by model, provider, source, and session. Use for spend reviews, model-mix analysis, unpriced usage detection, or export-friendly cost summaries.ProductivitateFără avertismente★ 1,1 K↓ —
- daily-journalhuytieu/COG-second-brainA passive daily work journal that Claude keeps FOR you so you never have to write it yourself. Append short entries after meaningful work (what was done, what you focused on, artifacts touched) to 01-daily/journal/YYYY-MM-DD.md. Run a guided reflection at night or in the morning. Use when you run /daily-journal, say "log this to my journal", "add to today's journal", "reflect on today/yesterday", or when finishing a meaningful chunk of work in any session.RedactareFără avertismente★ 1,3 K↓ —Apare și în 1 alt depozit
oncall-handoff
mohitagw15856/pm-claude-skills
De la autor
Write a structured end-of-shift on-call handoff so the incoming engineer inherits state, not surprises. Use when asked to write an on-call handoff, oncall handover, shift handoff, pager handoff, or end-of-week SRE summary. Produces a handoff note with open incidents, watchlist alerts, in-flight investigations, recent changes, and one-line asks.
Instalare
npx skills add mohitagw15856/pm-claude-skills --skill oncall-handoff -a claude-code
Se instalează în .claude/skills/oncall-handoff/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md