Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.492 de skill-uri din 2.391 de depozite · actualizat acum 9 ore
49.492 de skill-uri
- pnas-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after PNAS reviews arrive to triage the decision, prioritize experiments, and draft a point-by-point response that is respectful, evidence-led, and honest about limits. Do not run before the main text is actually revised.AlteleFără avertismente★ 1,4 K↓ —
- pnas-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which pnas-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for PNAS (Proceedings of the National Academy of Sciences). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- nejm-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after NEJM reviews arrive — often including a dedicated statistical reviewer and an editor letter — to triage the decision, answer statistical comments rigorously, and draft a point-by-point response that quotes each comment, the response, and the revised manuscript text. Do not run before the main text is actually revised.RedactareFără avertismente★ 1,4 K↓ —
- nejm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which nejm-* sub-skill to invoke next, or when sequencing a clinical manuscript from significance test through response to reviewers for The New England Journal of Medicine. Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- ndss-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an NDSS submission calendar — choosing between the summer and fall cycles, backward-planning from the AoE deadline through early-reject, rebuttal, notification, camera-ready, and the Seoul symposium, and placing NDSS honestly inside the security big-four retargeting year.ProductivitateFără avertismente★ 1,4 K↓ —
- mind-workflowbrycewang-stanford/Awesome-Journal-SkillsUse as the entry point for any Mind (philosophy journal) article. Routes to the right Mind sub-skill based on where you are in the lifecycle and whether the piece is an article, discussion note, book review, or critical notice. Mind is analytic philosophy — argument, not data — so the router's first job is to confirm there is a sharp thesis and a sound argument. It dispatches; it does not draft content.ProductivitateFără avertismente★ 1,4 K↓ —
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ȘtiințăFără avertismente★ 1,4 K↓ —
- nejm-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the NEJM structured abstract — four headed sections (Background, Methods, Results, Conclusions), ≤250 words, with the trial registration number and funding source, leading the Results with the primary outcome reported as an effect size with a 95% CI. Late-stage polish skill.RedactareFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,4 K↓ —
- relay-80-100-workflowAgentWorkforce/relayUse when writing agent-relay workflows that must fully validate features end-to-end before merging. Covers the 80-to-100 pattern - going beyond "code compiles" to "feature works, tested E2E locally." Includes repair-before-failure validation gates, review-depth fresh-eyes review/fix loops with test hardening, PGlite for in-memory Postgres testing, mock sandbox patterns, test-fix-rerun loops, verify gates after every edit, and the full lifecycle from implementation through passing tests to commit.ProductivitateFără avertismente★ 1,1 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,4 K↓ —
- imc-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,4 K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivitateFără avertismente★ 1,4 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,4 K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivitateFără avertismente★ 1,4 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- relay-80-100-workflowAgentWorkforce/relayUse when writing agent-relay workflows that must fully validate features end-to-end before merging. Covers the 80-to-100 pattern - going beyond "code compiles" to "feature works, tested E2E locally." Includes repair-before-failure validation gates, review-depth fresh-eyes review/fix loops with test hardening, PGlite for in-memory Postgres testing, mock sandbox patterns, test-fix-rerun loops, verify gates after every edit, and the full lifecycle from implementation through passing tests to commit.ProductivitateFără avertismente★ 1,1 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
asc-subscription-localization
rorkai/app-store-connect-cli-skills
De la autor
Bulk-localize subscription, subscription-group, and in-app purchase display names across App Store locales using asc, including API 4.4.1 version-scoped v2 resources. Use when filling or updating subscription/IAP names and descriptions without App Store Connect UI work.
Instalare
npx skills add rorkai/app-store-connect-cli-skills --skill asc-subscription-localization -a claude-code
Se instalează în .claude/skills/asc-subscription-localization/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md