Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.492 de skill-uri din 2.391 de depozite · actualizat acum 8 ore
49.492 de skill-uri
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ȘtiințăFără avertismente★ 1,4 K↓ —
- nejm-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the NEJM structured abstract — four headed sections (Background, Methods, Results, Conclusions), ≤250 words, with the trial registration number and funding source, leading the Results with the primary outcome reported as an effect size with a 95% CI. Late-stage polish skill.RedactareFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,4 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- status-page-generatorkostja94/marketing-skillsDeprecated compatibility entry for Status Page construction. This page is now maintained in Pagina; install and use page-builder to build a new Status Page.AlteleFără avertismente★ 1,1 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- translationkostja94/marketing-skillsTranslate, transcreate, review, or maintain multilingual product and marketing content, including source locking, glossary decisions, language style, machine-assisted workflows, legal-content safeguards, QA, and source-change synchronization. Use localization-strategy for market scope, locale architecture, rollout, and production release planning.TestareFără avertismente★ 1,1 K↓ —
- impact-reportmohitagw15856/pm-claude-skillsWrite a compelling nonprofit impact or annual report that shows donors what their money achieved. Use when asked to write an impact report, an annual report, a grant outcomes report, or to report results to funders/donors. Produces a structured report — mission and year in brief, outcomes with real numbers and a beneficiary story, financials at a glance, and a forward ask — that builds trust and renews giving.FinanțeFără avertismente★ 1,5 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- executing-plansGanyuanRan/AegisUse when executing a written implementation plan across sessions or with review checkpoints. Small or single-slice plans stay inline. For same-session independent tasks, use subagent-driven-development instead.PlanificareFără avertismente★ 1,4 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
- fse-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ESEC/FSE research-track submission for HotCRP readiness, covering the mandatory paper-registration step, the ACM Primary Article Template page budget, double-anonymous "heavy" anonymity, the open-science Data Availability statement, PACMSE publication, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- eacl-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EACL project timeline through ACL Rolling Review, covering the single viable ARR cycle with no fallback, backward planning from the one deadline, the rebuttal window, the commitment decision to EACL, notification, and camera-ready through ACL Anthology publication, plus re-routing since the next chance is another conference.ProductivitateFără avertismente★ 1,4 K↓ —
- cell-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which cell-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for Cell (Cell Press). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- colm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLM submission campaign across the calendar — working backward from the late-March abstract and paper deadlines through the May-June rebuttal, July decisions, August camera-ready, and October conference, coordinating co-authors, compute, and reciprocal-reviewing duties, and slotting COLM into a multi-venue LM-research pipeline.ProductivitateFără avertismente★ 1,4 K↓ —
- resumemohitagw15856/pm-claude-skillsWrite a sharp, achievement-led resume/CV that passes ATS and earns the interview. Use when asked to write or rewrite a resume or CV, turn experience into a resume, or tailor a resume to a job. Produces a clean, single-column, ATS-friendly resume — summary, experience as quantified accomplishment bullets, skills, and education — ready to export as a designed PDF.DocumenteFără avertismente★ 1,5 K↓ —
funnel-flow-architecture
rampstackco/claude-skills
De la autor
Architecting cross-tool conversion flows that match audience and stage. Landing page to lead magnet to nurture sequence to offer to advanced funnels. Honest about silo-funnels (every tool standalone), kitchen-sink-funnels (every audience squeezed through one path), and matched-funnels (architecture matched to audience-and-stage) patterns. Triggers on funnel design, conversion architecture, marketing funnel, growth funnel, lifecycle architecture, nurture sequence design, multi-tool funnel orchestration. Also triggers when the team's growth tools are working individually but not together, when audience segments share one nurture path, or when a funnel is being architected from scratch.
Instalare
npx skills add rampstackco/claude-skills --skill funnel-flow-architecture -a claude-code
Se instalează în .claude/skills/funnel-flow-architecture/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (11)
- README.md
- SKILL.md
- references/architecture-anti-patterns.md
- references/audience-and-stage-segmentation.md
- references/common-funnel-architecture-failures.md
- references/cross-tool-data-flow-patterns.md
- references/entry-point-architecture-patterns.md
- references/funnel-iteration-discipline.md
- references/funnel-measurement-patterns.md
- references/nurture-sequence-architecture.md
- references/tool-to-funnel-mapping.md