Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.492 de skill-uri din 2.391 de depozite · actualizat acum 5 ore
49.492 de skill-uri
- nejm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which nejm-* sub-skill to invoke next, or when sequencing a clinical manuscript from significance test through response to reviewers for The New England Journal of Medicine. Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- ndss-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an NDSS submission calendar — choosing between the summer and fall cycles, backward-planning from the AoE deadline through early-reject, rebuttal, notification, camera-ready, and the Seoul symposium, and placing NDSS honestly inside the security big-four retargeting year.ProductivitateFără avertismente★ 1,4 K↓ —
- nejm-citationbrycewang-stanford/Awesome-Journal-SkillsUse to convert references to NEJM's Vancouver / ICMJE numbered style — numbered in order of appearance, limited author lists then et al., NLM journal abbreviations, and a capped reference count. Late-stage style pass.AlteleFără avertismente★ 1,4 K↓ —
- top-banner-generatorkostja94/marketing-skillsDeprecated compatibility entry for Top Banner construction. This component is now maintained in Bricks; install and use component-builder to build a new Top Banner.AlteleFără avertismente★ 1,1 K↓ —
- mobile-friendlykostja94/marketing-skillsWhen the user wants to optimize for mobile-first indexing or fix mobile usability. Also use when the user mentions "mobile-friendly," "mobile-first indexing," "mobile SEO," "responsive design," "mobile adaptation," "mobile viewport," "viewport meta," "touch targets," "font size mobile," "AMP," or "Accelerated Mobile Pages." For viewport meta, use page-metadata.DesignFără avertismente★ 1,1 K↓ —
- nejm-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the NEJM structured abstract — four headed sections (Background, Methods, Results, Conclusions), ≤250 words, with the trial registration number and funding source, leading the Results with the primary outcome reported as an effect size with a 95% CI. Late-stage polish skill.RedactareFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- web-designhashgraph-online/awesome-codex-pluginsUse for web interfaces, landing pages, product sites, dashboards, React, Next.js, Astro, Tailwind, frontend audits, responsive design, browser interaction, web motion, or requests for a distinctive non-generic website. Select the web surface and implementation track, load a small reference bundle, preserve usability and accessibility, and validate the rendered result. Skip when the target is exclusively native Apple, Android, or Windows.DesignFără avertismente★ 1,5 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- render-stopmotion-hand-swatch-cyclegooseworks-ai/goose-skillsAssemble a stop-motion hand-swatch-cycle product-demo ad from a config — a sequence of still PLATES (one hand swiping a single-barrel product across a test surface, the barrel + swatch changing per plate while the hand, background, crop, and lighting stay locked) is PNG→mp4 loop-encoded at each plate's own stop-motion hold (fast motion frames 150–250ms, per-shade ~380ms, hero beats 1100–1800ms), concat-demuxed with HARD cuts into a silent master, closed on a Playwright HTML-rendered branded end card (serif tagline + sans subtitle + real logo SVG over a hero BG, never AI-rendered text), and muxed with a pre-sourced music track playing under the end card with a fade tail (no VO). This is the FREE deterministic assembly stage (loop-encode + concat-demux + end-card render + music mux); the master-anchor plate, shade plates, and end-card BG come from create-image-gpt-image-fal and the track from create-music-elevenlabs. Use for the stopmotion-hand-swatch-cycle format.MediaFără avertismente★ 1,3 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignFără avertismente★ 1,4 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- migrate-from-openclawnanocoai/nanoclawMigrate from OpenClaw to NanoClaw v2. Detects an existing OpenClaw installation, extracts identity, channel credentials, scheduled tasks, and other config, then guides interactive migration. Triggers on "migrate from openclaw", "openclaw migration", "import from openclaw".ProductivitateFără avertismente★ 31,1 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
- fse-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ESEC/FSE research-track submission for HotCRP readiness, covering the mandatory paper-registration step, the ACM Primary Article Template page budget, double-anonymous "heavy" anonymity, the open-science Data Availability statement, PACMSE publication, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- eacl-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EACL project timeline through ACL Rolling Review, covering the single viable ARR cycle with no fallback, backward planning from the one deadline, the rebuttal window, the commitment decision to EACL, notification, and camera-ready through ACL Anthology publication, plus re-routing since the next chance is another conference.ProductivitateFără avertismente★ 1,4 K↓ —
ap-roadmap-scout
Spielewoy/autoprompt-skill
De la autor
Answer one named planning question with observations tied to the inspected sources; do not write or coordinate the roadmap.
Instalare
npx skills add Spielewoy/autoprompt-skill --skill ap-roadmap-scout -a claude-code
Se instalează în .claude/skills/ap-roadmap-scout/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md