Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.492 de skill-uri din 2.391 de depozite · actualizat acum 2 ore
49.492 de skill-uri
- pnas-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the PNAS abstract — a single self-contained paragraph of ~250 words, quantified and accessible to a broad scientific audience. Distinguishes the abstract (what/how/found, for scientists) from the Significance Statement (why-it-matters, for everyone). Late-stage polish.ȘtiințăFără avertismente★ 1,4 K↓ —
- pnas-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after PNAS reviews arrive to triage the decision, prioritize experiments, and draft a point-by-point response that is respectful, evidence-led, and honest about limits. Do not run before the main text is actually revised.AlteleFără avertismente★ 1,4 K↓ —
- pnas-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which pnas-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for PNAS (Proceedings of the National Academy of Sciences). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- nejm-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after NEJM reviews arrive — often including a dedicated statistical reviewer and an editor letter — to triage the decision, answer statistical comments rigorously, and draft a point-by-point response that quotes each comment, the response, and the revised manuscript text. Do not run before the main text is actually revised.RedactareFără avertismente★ 1,4 K↓ —
- nejm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which nejm-* sub-skill to invoke next, or when sequencing a clinical manuscript from significance test through response to reviewers for The New England Journal of Medicine. Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- nejm-citationbrycewang-stanford/Awesome-Journal-SkillsUse to convert references to NEJM's Vancouver / ICMJE numbered style — numbered in order of appearance, limited author lists then et al., NLM journal abbreviations, and a capped reference count. Late-stage style pass.AlteleFără avertismente★ 1,4 K↓ —
- mind-workflowbrycewang-stanford/Awesome-Journal-SkillsUse as the entry point for any Mind (philosophy journal) article. Routes to the right Mind sub-skill based on where you are in the lifecycle and whether the piece is an article, discussion note, book review, or critical notice. Mind is analytic philosophy — argument, not data — so the router's first job is to confirm there is a sharp thesis and a sound argument. It dispatches; it does not draft content.ProductivitateFără avertismente★ 1,4 K↓ —
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ȘtiințăFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,4 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
- imc-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivitateFără avertismente★ 1,4 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignFără avertismente★ 1,4 K↓ —
- prd-templatemohitagw15856/pm-claude-skillsCreate a Product Requirements Document following proven PM template structure. Use when asked to write a PRD, product spec, feature specification, or requirements document for a new feature or product. Produces a complete PRD with problem statement, user stories, functional requirements, technical considerations, and success metrics.PlanificareFără avertismente★ 1,5 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- md-reviewalirezarezvani/claude-skillsUse when converting a markdown code review with diff blocks and severity callouts into a two-column HTML review. Parses diffs with diff_parser.py and annotations with annotation_extractor.py; requires a named reviewer.InginerieFără avertismente★ 29,3 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
eval-report
agentscope-ai/OpenJudge
De la autor
Use when the user has run multiple evaluation skills and wants a comprehensive analysis — maturity assessment, cross-skill signals, trends, prioritized actions, and an executive summary. Also use when the user mentions eval health check, evaluation audit, ship readiness, evaluation maturity, or "how good is my evaluation system itself." This is a read-only analysis skill.
Instalare
npx skills add agentscope-ai/OpenJudge --skill eval-report -a claude-code
Se instalează în .claude/skills/eval-report/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md