Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
48.622 de skill-uri din 2.355 de depozite · actualizat acum 14 ore
47.548 de skill-uri
- soda-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a SODA (ACM-SIAM Symposium on Discrete Algorithms) campaign end to end — backward-planning to the July AoE deadline, SODA's seat in the theory calendar between STOC and FOCS deadlines, the September rebuttal and October decision, satellite deadlines (ALENEX, SOSA), and the January conference.ProductivitateFără avertismente★ 1,3 K↓ —
- pmla-workflowbrycewang-stanford/Awesome-Journal-SkillsUse as the entry point for any PMLA (Publications of the Modern Language Association) manuscript. Routes to the right PMLA sub-skill based on where you are in the lifecycle and which venue fits — a regular blind-reviewed article or a special feature (Theories and Methodologies, The Changing Profession, Criticism in Translation, Little-known Documents). It dispatches; it does not draft content.ProductivitateFără avertismente★ 1,3 K↓ —
- verify-cli-runreticlehq/reticleProve that a command-line tool actually did what it said, instead of trusting its exit code and its output. Snapshots the filesystem before and after, names the expected consequence in advance, and returns one of four verdicts with what could not be seen. Use after running a build, a migration, a scaffolder, a formatter, a codegen step, or an AI coding CLI; when a command printed success and you are about to report "done"; when you are about to write "exit code 0, so it worked"; or when a tool claims it edited files. Needs nothing installed.InginerieFără avertismente★ 1,3 K↓ —
- pnas-abstractbrycewang-stanford/Awesome-Journal-SkillsUse to write the PNAS abstract — a single self-contained paragraph of ~250 words, quantified and accessible to a broad scientific audience. Distinguishes the abstract (what/how/found, for scientists) from the Significance Statement (why-it-matters, for everyone). Late-stage polish.ȘtiințăFără avertismente★ 1,3 K↓ —
- pnas-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after PNAS reviews arrive to triage the decision, prioritize experiments, and draft a point-by-point response that is respectful, evidence-led, and honest about limits. Do not run before the main text is actually revised.AlteleFără avertismente★ 1,3 K↓ —
- pnas-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which pnas-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for PNAS (Proceedings of the National Academy of Sciences). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,3 K↓ —
- nejm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which nejm-* sub-skill to invoke next, or when sequencing a clinical manuscript from significance test through response to reviewers for The New England Journal of Medicine. Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,3 K↓ —
- minutes-live-sidekicksilverstein/minutesAct as the user's live meeting sidekick inside the current terminal agent session. Use when the user explicitly asks you, the terminal agent, to watch a meeting, follow the live transcript, answer during the call, offer strategist thoughts, silently watch for risks, or track decisions. Do not use this skill to start or control the separate Minutes Coach HUD; explicit Coach or HUD lifecycle requests belong to minutes-copilot, and an ambiguous request such as "coach me live" requires one short surface clarification.AlteleFără avertismente★ 1,6 K↓ —Apare și în 1 alt depozit
- sandbox-mcpalibaba/skill-upVerify Sandbox MCP can be installed and called from skill-up.AlteleFără avertismente★ 1,4 K↓ —
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ȘtiințăFără avertismente★ 1,3 K↓ —
- resuminghashgraph-online/awesome-codex-pluginsResume an interrupted workflow run with verify-first strategy — loads sidecar state, verifies the last step, and continues execution.ProductivitateFără avertismente★ 1,5 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,3 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,3 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,3 K↓ —
- test-gaphashgraph-online/awesome-codex-pluginsSurface changed git diff lines that are not covered by testsTestareFără avertismente★ 1,5 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,3 K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,3 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,3 K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivitateFără avertismente★ 1,3 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,3 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,3 K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivitateFără avertismente★ 1,3 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,3 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,3 K↓ —
oncall-handoff
mohitagw15856/pm-claude-skills
De la autor
Write a structured end-of-shift on-call handoff so the incoming engineer inherits state, not surprises. Use when asked to write an on-call handoff, oncall handover, shift handoff, pager handoff, or end-of-week SRE summary. Produces a handoff note with open incidents, watchlist alerts, in-flight investigations, recent changes, and one-line asks.
Instalare
npx skills add mohitagw15856/pm-claude-skills --skill oncall-handoff -a claude-code
Se instalează în .claude/skills/oncall-handoff/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md