Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.496 de skill-uri din 2.391 de depozite · actualizat acum 11 minute
49.496 de skill-uri
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,4 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
- imc-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivitateFără avertismente★ 1,4 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivitateFără avertismente★ 1,4 K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignFără avertismente★ 1,4 K↓ —
- clone-briefmohitagw15856/pm-claude-skillsSend your position to a meeting instead of your body — a one-page brief carrying your stances, fallbacks, red lines, tradables, and delegation limits, readable by the colleague (or agent) representing you. Use when you can't attend a decision-making meeting, when double-booked, when briefing someone to negotiate for you, or 'what would you need from me to represent me?'. Produces the clone brief plus a 60-second verbal version for the person carrying it.AlteleFără avertismente★ 1,5 K↓ —
- agent-designeralirezarezvani/claude-skillsDesign multi-agent systems (supervisor, swarm, pipeline) and tool schemas; find bottlenecks in run logs. Use whenever agents split work or a run is slow or costly. Not for Claude Code workflow files (workflow-builder).DesignFără avertismente★ 29,3 K↓ —
- qbr-deckmohitagw15856/pm-claude-skillsBuild a Quarterly Business Review (QBR) deck structure and narrative for a customer account. Use when asked to prepare a QBR, business review meeting, executive review, or quarterly check-in with a customer. Produces a slide-by-slide QBR structure with talking points, metrics review, value narrative, and mutual next steps.DocumenteFără avertismente★ 1,5 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
- sprint-briefmohitagw15856/pm-claude-skillsGenerate a structured sprint brief from sprint data and goals. Use when asked to write a sprint brief, create a sprint summary, document sprint goals and scope, or produce a team-facing sprint overview. Produces a scannable brief with sprint goal, rationale, grouped work, critical path, risks, and definition of done.RedactareFără avertismente★ 1,5 K↓ —
- chi-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM CHI Papers submission for PCS readiness, covering the September full-paper deadline, the anonymized single-column template, word-count norms instead of page limits, subcommittee designation, supplementary and video upload, anonymization of external links, and CHI's desk-reject triage before upload.MediaFără avertismente★ 1,4 K↓ —
- cell-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which cell-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for Cell (Cell Press). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- icml-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning or sequencing an ICML manuscript workflow end to end - from topic selection and drafting through OpenReview submission, double-blind review, author response, camera-ready, PMLR publication, public original-submission release, and rerouting decisions. Use when you need the next ICML skill, the official page to reopen, or the blocking gap for the current stage.ProductivitateFără avertismente★ 1,4 K↓ —
- django-tddhashgraph-online/awesome-codex-pluginsDjango testing strategies with pytest-django, TDD methodology, factory_boy, mocking, coverage, and testing Django REST Framework APIs.TestareFără avertismente★ 1,5 K↓ —
- colt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLT (Conference on Learning Theory) submission calendar backward from the single AoE paper deadline — proof-completion and verification milestones, writing and appendix-assembly passes, CMT logistics, the rebuttal window, decision aftermath, and PMLR camera-ready with conference presentation in early summer.ProductivitateFără avertismente★ 1,4 K↓ —
- rekallhashgraph-online/awesome-codex-pluginsCompact the current Codex VS Code extension thread through Rekall with a verified handoff and optional one-time continuation. Use on an explicit compaction request or after a substantial completed stage; standalone Codex CLI sessions are unsupported.InginerieFără avertismente★ 1,5 K↓ —
- toc-generatorkostja94/marketing-skillsDeprecated compatibility entry for Table of Contents construction. This component is now maintained in Bricks; install and use component-builder to build a new Table of Contents.AlteleFără avertismente★ 1,1 K↓ —
seo-audit
alirezarezvani/claude-skills
De la autor
Find why a site is not ranking: technical SEO, on-page issues, meta tags, site health. Use whenever the user asks why a page is not on Google, why traffic dropped or for an SEO audit.
Instalare
npx skills add alirezarezvani/claude-skills --skill seo-audit -a claude-code
Se instalează în .claude/skills/seo-audit/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
- Include scripturi pe care nu le-am verificatScăzut
De ce 88
Fișiere (7)
- SKILL.md
- references/cwv-thresholds.md
- references/eeat-framework.md
- references/schema-types.md
- references/seo-audit-reference.md
- scripts/seo_checker.py
- scripts/seo_health_scorer.py