Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.479 de skill-uri din 2.391 de depozite · actualizat acum 11 minute
49.479 de skill-uri
- ase-experimentsbrycewang-stanford/Awesome-Journal-SkillsUse when designing or auditing the evaluation of an ASE (IEEE/ACM Automated Software Engineering) paper, covering real subject systems, fair runnable tool baselines, task-matched effectiveness metrics, ablations that isolate a learned component, oracle and correctness validation, contamination-aware LLM handling, and provenance for mining.ȘtiințăFără avertismente★ 1,4 K↓ —
- socc-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ACM SoCC project timeline from venue fit through the two-round abstract+paper deadlines, the rebuttal, notification, camera-ready, and presentation, with backward-planning offsets for a cloud-systems measurement paper and honest handling of the two-rounds-per-year cadence and the no-cross-round-resubmission rule.ProductivitateFără avertismente★ 1,4 K↓ —
- minutes-copilotsilverstein/minutesStart and control Minutes Coach, the separate real-time copilot HUD, with an explicit meeting goal. Use only for explicit Coach or HUD lifecycle requests such as "start Minutes Coach", "open the Coach HUD", "pause Minutes Coach", "resume Minutes Coach", "Minutes Coach status", or "stop Minutes Coach". Do not use for requests that explicitly ask the current terminal agent to watch or strategize; those belong to minutes-live-sidekick. An ambiguous request such as "coach me live" requires one short surface clarification and must not automatically start Coach.AlteleFără avertismente★ 1,6 K↓ —Apare și în 1 alt depozit
- uai-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a UAI submission for OpenReview readiness, covering the February paper deadline, the 8-page main part with unlimited appendices in one PDF, the 15 MB file cap, the optional 50 MB supplementary ZIP, double-blind rules, the reviewer-volunteer agreement, dual-submission checks, and desk-reject triage before upload.DocumenteFără avertismente★ 1,4 K↓ —
- soda-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a SODA (ACM-SIAM Symposium on Discrete Algorithms) campaign end to end — backward-planning to the July AoE deadline, SODA's seat in the theory calendar between STOC and FOCS deadlines, the September rebuttal and October decision, satellite deadlines (ALENEX, SOSA), and the January conference.ProductivitateFără avertismente★ 1,4 K↓ —
- render-glassy-matte-grwmgooseworks-ai/goose-skillsAssemble a multi-scene GRWM beauty-demo ad from a config — a locked-identity creator applies ~5 products step by step while a SEPARATE ElevenLabs voiceover narrates and every scene cut is snapped to the VO's product-name word-starts (Whisper word-level timestamps), then ~5 Playwright product overlay cards (real PDP-verified taglines) are composited onto the master each on its product-NAME word-start, the SEPARATE VO is mixed on top of a ducked music bed at loudnorm I=-14, clean-white 3-words/cue captions are burned, and the video closes on a flat-lay end card. This is the FREE deterministic assembly stage (re-cut to the VO word-starts, hard-concat, Playwright card render + card composite, VO plus music mix, caption burn, flat-lay end card); the VO, scene clips, product cutouts, and music come from create-music-elevenlabs / create-image-gpt-image-fal / create-video-fal. Use for the glassy-matte-grwm format.MediaFără avertismente★ 1,3 K↓ —
- iso42001-specialistalirezarezvani/claude-skillsUse for ISO/IEC 42001 AI management system work: gap analysis against Clauses 4-10, the AI risk register and Annex A controls, or the internal audit plan. Runs aims_gap_analyzer.py, ai_risk_register_builder.py and aims_audit_scheduler.py.PlanificareFără avertismente★ 29,3 K↓ —
- pnas-citationbrycewang-stanford/Awesome-Journal-SkillsUse to convert references to PNAS's numbered citation style — cited in order of appearance, a numbered reference list, full author lists, abbreviated journal titles. Provides formats for article/book/chapter/dataset/preprint and an author-date → PNAS conversion table. Late-stage style pass.MarketingFără avertismente★ 1,4 K↓ —
- pldi-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a PLDI campaign across its annual clock — backward-planning from the November deadline through winter reviewing, the February response window, March notification, post-acceptance artifact evaluation, PACMPL production, and the June conference, with owners for each deliverable.ProductivitateFără avertismente★ 1,4 K↓ —
- pnas-rebuttalbrycewang-stanford/Awesome-Journal-SkillsUse after PNAS reviews arrive to triage the decision, prioritize experiments, and draft a point-by-point response that is respectful, evidence-led, and honest about limits. Do not run before the main text is actually revised.AlteleFără avertismente★ 1,4 K↓ —
- pnas-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which pnas-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for PNAS (Proceedings of the National Academy of Sciences). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- audit-decisionsdzhng/skillsAudit the decisions an implementing agent made, not its diff — a pure audit that traces the session's history into a decisions ledger, changes no code, and never blocks an unsupervised run. Working code still embeds architecture the user never chose; surface it because future work inherits it. Use when the user wants to review the decisions the AI made on their behalf, before merging or committing AI-implemented work, when integrating a delegated subagent's pass, or when a fix "works" but might be a point fix.PlanificareFără avertismente★ 1,4 K↓ —
- review-overleaffcakyon/claude-codex-settingsThis skill should be used when user asks to "fetch overleaf review comments", "address overleaf reviews", "apply overleaf comments", "review my overleaf paper", "sync overleaf feedback to local", "what comments are on my overleaf doc", or wants to act on Overleaf reviewer feedback in a local git-tracked LaTeX repo.InginerieFără avertismente★ 1,2 K↓ —
- nejm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which nejm-* sub-skill to invoke next, or when sequencing a clinical manuscript from significance test through response to reviewers for The New England Journal of Medicine. Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- nejm-citationbrycewang-stanford/Awesome-Journal-SkillsUse to convert references to NEJM's Vancouver / ICMJE numbered style — numbered in order of appearance, limited author lists then et al., NLM journal abbreviations, and a capped reference count. Late-stage style pass.AlteleFără avertismente★ 1,4 K↓ —
- cta-generatorkostja94/marketing-skillsDeprecated compatibility entry for Call to Action construction. This component is now maintained in Bricks; install and use component-builder to build a new Call to Action.AlteleFără avertismente★ 1,1 K↓ —
- kdd-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a KDD submission for readiness in either cycle, covering Research vs ADS track declaration, OpenReview profile completeness for all authors, the ACM sigconf 8-content-page budget, double-blind checks, in-paper artifact references, resubmission declarations, and desk-reject triggers specific to ACM SIGKDD.ȘtiințăFără avertismente★ 1,4 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,4 K↓ —
- brandingkostja94/marketing-skillsWhen the user wants to define, audit, or apply brand strategy—purpose, values, positioning, storytelling, voice, narrative (not only visuals). Also use when the user mentions "brand strategy," "brand story," "brand storytelling," "brand voice," "brand identity," "brand guidelines," "brand purpose," "brand values," "origin story," "brand narrative," "brand personality," "brand archetype," "slide deck branding," "PPT brand colors," or "document style guide." For typography, colors, design tokens, and frontend visuals, use brand-visual-generator.DocumenteFără avertismente★ 1,1 K↓ —
- content-humanizeralirezarezvani/claude-skillsMake a draft sound less like AI: fix generic, robotic text with rhythm, specifics, personality and brand voice. Use whenever the user says copy sounds like ChatGPT, bland or stiff, or not like them.RedactareFără avertismente★ 29,3 K↓ —
- programmatic-seofcakyon/claude-codex-settingsUse when planning many similar pages from a template and a data set: choosing the pattern, deciding whether the data can carry it, and avoiding the thin-content failure that gets page sets deindexed.MarketingFără avertismente★ 1,2 K↓ —
- serp-featureskostja94/marketing-skillsWhen the user wants to understand or optimize for SERP feature types (PAA, sitelinks, rich results, AI Overviews). Also use when the user mentions "SERP," "SERP features," "search result features," "People Also Ask," "PAA," "sitelinks," "knowledge panel," "local pack," "rich results," "zero-click," "SERP types," "AI Overviews," "Bing Copilot," or "Yandex AI." For JSON-LD and rich result implementation, use schema-markup. For organic strategy and roadmap, use seo-strategy.MarketingFără avertismente★ 1,1 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,4 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,4 K↓ —
pods-workflow
brycewang-stanford/Awesome-Journal-Skills
De la autor
Use when planning an ACM PODS project timeline across its multiple submission cycles per year, from venue fit through the EasyChair abstract-then-paper deadlines, the 48-hour rebuttal, the accept/reject/revision decision and shepherded revision round, PACMMOD-track publication, the arXiv full version, and presentation — with backward-planning offsets for a theory paper and honest handling of cycle choice.
Instalare
npx skills add brycewang-stanford/Awesome-Journal-Skills --skill pods-workflow -a claude-code
Se instalează în .claude/skills/pods-workflow/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md