Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
48.622 de skill-uri din 2.355 de depozite · actualizat acum 49 de minute
47.548 de skill-uri
- ase-camera-readybrycewang-stanford/Awesome-Journal-SkillsUse when preparing the ASE (IEEE/ACM Automated Software Engineering) camera-ready after acceptance or a successful revision, covering systematic de-anonymization, the extra content page, the mandatory Data Availability finalization, the correct IEEE/ACM template and metadata, permanentized artifact links, and dual IEEE-Xplore/ACM-DL production checks.AlteleFără avertismente★ 1,3 K↓ —
- atc-camera-readybrycewang-stanford/Awesome-Journal-SkillsUse when preparing the ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) camera-ready after a conditional accept — de-anonymizing systematically, folding in the shepherd's required revisions, permanentizing artifact links, completing ACM Open Access metadata and the transition APC, and passing production checks for the November Hong Kong proceedings.AlteleFără avertismente★ 1,3 K↓ —
- aamas-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an AAMAS project timeline from venue fit through abstract, full-paper or extended-abstract upload, supplementary material, the double-blind rebuttal, decision, IFAAMAS camera-ready, registration, and presentation, with track-specific deadlines and backward-planning offsets for a game-theory-plus-experiments paper.ProductivitateFără avertismente★ 1,3 K↓ —
- sci-writingbrycewang-stanford/Awesome-Journal-SkillsUse when choosing the Science (AAAS) format (Research Article vs Report) and holding its length and structure budgets — main-text word caps, figure caps, argument-ordered Results, and deciding what belongs in the main text versus Supplementary Materials.RedactareFără avertismente★ 1,3 K↓ —
- sci-figuresbrycewang-stanford/Awesome-Journal-SkillsUse to finalize Science display items — panel/word budget, column-width sizing, minimum font sizes, color-accessibility, and showing the data (points over bars). Enforces figure rigor before submission.ȘtiințăFără avertismente★ 1,3 K↓ —
- nejm-reportingbrycewang-stanford/Awesome-Journal-SkillsUse to select and enforce the correct EQUATOR reporting guideline for a clinical study headed to NEJM — CONSORT for RCTs (with the participant flow diagram), STROBE for observational, PRISMA for systematic reviews — and to build the required checklist and diagram before submission.ȘtiințăFără avertismente★ 1,3 K↓ —
- aaai-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an AAAI main technical track submission for OpenReview readiness, double-blind anonymity, page limits, reproducibility checklist, supplementary material, author limits, multiple-submission policy, and AAAI AI-use policy compliance.JuridicFără avertismente★ 1,3 K↓ —
- sci-framingbrycewang-stanford/Awesome-Journal-SkillsUse when locking the conceptual advance and the "why now" before drafting for Science (AAAS) — converts a correct result into a Science-shaped narrative that leads with the broad advance rather than the background, and seeds the title, abstract, and cover letter.ȘtiințăFără avertismente★ 1,3 K↓ —
- uai-experimentsbrycewang-stanford/Awesome-Journal-SkillsUse when designing or auditing UAI experiments where inference quality is the endpoint, covering calibration and coverage measurement, posterior diagnostics, structure-recovery metrics for causal and graphical models, seeded repeated runs, baselines from both sampling and optimization families, and mapping each claim to its evidence.AlteleFără avertismente★ 1,3 K↓ —
- cav-experimentsbrycewang-stanford/Awesome-Journal-SkillsUse when designing or auditing a CAV (Computer Aided Verification) empirical evaluation, covering standard benchmark sets (SV-COMP/SMT-COMP/HWMCC/VNN-COMP), fair baseline solvers with pinned versions and equal resource limits, timeout-dominated comparisons, soundness cross-checks and proof witnesses, cactus/scatter reporting, and matching evidence to the shape of each verification claim.AlteleFără avertismente★ 1,3 K↓ —
- jama-scope-fitbrycewang-stanford/Awesome-Journal-SkillsUse when judging whether a clinical study clears JAMA's general-medical-importance bar before investing in a full submission. Assesses fit and article-type match; it does NOT design the study or write the paper.DesignFără avertismente★ 1,3 K↓ —
- dac-experimentsbrycewang-stanford/Awesome-Journal-SkillsUse when designing or auditing the empirical evaluation of an ACM/IEEE Design Automation Conference (DAC) Research Manuscript, covering standard EDA benchmark suites (ISPD, EPFL, ISCAS/ITC, TAU, CircuitNet, OpenROAD flows), fair state-of-the-art baselines, QoR/PPA reporting with runtime, per-benchmark honesty, ablations that isolate the mechanism, and contamination-aware ML-for-EDA evaluation.DesignFără avertismente★ 1,3 K↓ —
- chi-experimentsbrycewang-stanford/Awesome-Journal-SkillsUse when designing or auditing the studies behind an ACM CHI paper — matching evidence shape to contribution type, powering quantitative experiments, making qualitative work rigorous and auditable, reporting participants and ethics properly, and avoiding the ADR-Data and ADR-Method screening grounds.ȘtiințăFără avertismente★ 1,3 K↓ —
- icse-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.ProductivitateFără avertismente★ 1,3 K↓ —
- iros-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.ProductivitateFără avertismente★ 1,3 K↓ —
- jama-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which jama-* sub-skill to invoke next, or when sequencing a clinical manuscript from scope check through revision for JAMA (Journal of the American Medical Association). Routes — does not replace — the specialized skills.ProductivitateFără avertismente★ 1,3 K↓ —
- isca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.ProductivitateFără avertismente★ 1,3 K↓ —
- icra-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICRA submission calendar end to end — the September paper deadline, the two video-attachment windows, winter review silence, late-January notification, March camera-ready, and the May/June conference — or when interleaving a fallback RA-L or IROS plan around the single annual ICRA shot.ProductivitateFără avertismente★ 1,3 K↓ —
- ipsn-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys.ProductivitateFără avertismente★ 1,3 K↓ —
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,3 K↓ —
- team-briefhuytieu/COG-second-brainGenerate daily team intelligence brief by cross-referencing GitHub, Linear, Slack, PostHog, meetings, and braindumps with two-way Linear sync-backAlteleFără avertismente★ 1,3 K↓ —Apare și în 1 alt depozit
- research-competitorsgooseworks-ai/goose-skillsCompetitor research: what every main rival is running, launching, charging and saying now, what works for them, and what that means for you. Use when the marketer asks for competitor research or a teardown, "what ads are my competitors running", "how do they price", "find gaps and angles", "what changed this week" (a weekly watch), or "X just launched / shut down / cut prices" (react now). Also builds a sales battlecard, checks a competitor page's tools/pixels, or studies who engages with their LinkedIn posts. Delivers a readable report saved to the brand, so the next run reports what changed. Never copies their words or disparages them. Not for what people say about you or your market — use research-market; not for who your buyers are — use research-audience.ȘtiințăFără avertismente★ 1,3 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,3 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,3 K↓ —
integration-orchestrator
rampstackco/claude-skills
De la autor
Generate a phased delivery orchestration plan for creative-direction-driven work: which skills run when, what locks at which gate, how handoffs occur, and how the cadence implements in the team's tools (Jira, Linear, Notion, Figma, GitHub) with AI agents via MCP and CLI. A temporal map of phases, lock points, handoff specs, gate definitions, and QA verification gates. Distinct from `creative-brief` (static project brief) and `creative-direction` (aesthetic direction). Triggers on integration orchestrator, delivery cadence, project orchestration, when does the brief lock, how to phase creative direction, design-development handoff, QA gate, agent-driven QA, and when a creative-direction project is starting, mid-flight with broken cadence, or integrating AI agents into PM workflow. Does NOT fire for project scoping (use `creative-brief`), aesthetic direction (use `creative-direction`), or general project management without a creative-direction throughline.
Instalare
npx skills add rampstackco/claude-skills --skill integration-orchestrator -a claude-code
Se instalează în .claude/skills/integration-orchestrator/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (9)
- README.md
- SKILL.md
- references/automation-and-qa-tooling.md
- references/cadence-patterns.md
- references/example-orchestration.md
- references/gate-definitions.md
- references/handoff-protocols.md
- references/platform-implementation.md
- references/team-size-modulation.md