Skill-uri pentru agenți pe care le poți verifica înainte să le instalezi
Skill-uri SKILL.md publice din depozite GitHub cu peste 50 de stele și de la producători, scanate și evaluate. Instalează oricare dintre ele cu o singură comandă în Claude Code, Cursor, Codex, GitHub Copilot sau Gemini CLI.
49.409 skill-uri din 2.375 de depozite · actualizat acum 41 de minute
49.409 skill-uri
- icdt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDT (International Conference on Database Theory) campaign end to end, running the two-submission-cycle calendar backward from a chosen cycle deadline through abstract registration, the first-cycle revision round, LIPIcs camera-ready, and presentation at the co-located EDBT/ICDT event.ProductivitateFără avertismente★ 1,4 K↓ —
- iccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.ProductivitateFără avertismente★ 1,4 K↓ —
- icde-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an IEEE ICDE project timeline around the two-round-per-edition calendar, choosing between the June and November research deadlines, budgeting for a possible revise-and-resubmit window, and backward-planning a data-engineering systems paper from CMT submission through review, camera-ready, and IEEE Xplore publication.ProductivitateFără avertismente★ 1,4 K↓ —
- icdm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- hpca-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper.ProductivitateFără avertismente★ 1,4 K↓ —
- hri-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE HRI full-paper submission for PCS readiness — the mandatory abstract-then-paper two-step deadline, choosing the correct one of the five tracks, the 8-page acmart anonymous format, the double-blind sweep across PDF and video, the human-participants ethics acknowledgment, and desk-reject triage before the AoE cutoff.DocumenteFără avertismente★ 1,4 K↓ —
- iclr-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an ICLR project timeline from topic selection through OpenReview submission, discussion, revision, decision, camera-ready, poster, video, and public artifact release. Use when sequencing milestones against the current cycle's OpenReview deadlines, budgeting time for the long public discussion phase, or assigning owners for anonymity audits and reviewer-verifiable evidence paths.ProductivitateFără avertismente★ 1,4 K↓ —
- oma-brainstormNoufirst-fluke/oh-my-agentExplore goals, constraints, and alternative approaches before choosing a design. Use when the user requests ideation or design exploration.PlanificareFără avertismente★ 1,4 K↓ —
- dac-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM/IEEE Design Automation Conference (DAC) Research-Manuscript submission for Softconf readiness, covering the two-stage abstract-then-manuscript deadline, the 6+1-page ACM double-column page budget with its references-only last page, the double-blind anonymization sweep, TPC conflict-of-interest declaration, and desk-reject triage before the mid-to-late-November cutoff.DesignFără avertismente★ 1,4 K↓ —
- eccv-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when running an ECCV campaign end to end — the even-year calendar from February registration to the September conference, the retargeting triangle to CVPR and ICCV seen from the ECCV seat, where the 2026 cycle stands today, and backward planning a 2028 submission from the March deadline.ProductivitateFără avertismente★ 1,4 K↓ —
- verify-keyboard-accessreticlehq/reticleVerify that every interactive control on a page can take keyboard focus and that its primary action fires from the keyboard rather than only the mouse, and say plainly that Tab order cannot be verified today. Use when a component was hand-tested with a mouse, a custom dropdown/modal/combobox was added, or an accessibility report flags an unreachable control.AlteleFără avertismente★ 1,3 K↓ —
- basinfcakyon/claude-codex-settingsBuild and troubleshoot Cloudflare Basin analytics workflows with Basin Pipelines, Basin Catalog, and Basin SQL. Use for streaming data into R2 Iceberg tables, managing catalogs, or querying those tables; also use for requests using the former Data Platform, Pipelines, R2 Data Catalog, or R2 SQL names.DevOpsFără avertismente★ 1,2 K↓ —
- edbt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EDBT project timeline across the multiple-cycle rolling model — choosing a submission cycle, backward-planning through the author-feedback phase and the in-cycle revise-and-resubmit window, and handling the cycle-to-conference roll — for a database-systems paper published open access on OpenProceedings.ProductivitateFără avertismente★ 1,4 K↓ —
- ecai-workflowbrycewang-stanford/Awesome-Journal-SkillsUse to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.ProductivitateFără avertismente★ 1,4 K↓ —
- fse-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ESEC/FSE research-track submission for HotCRP readiness, covering the mandatory paper-registration step, the ACM Primary Article Template page budget, double-anonymous "heavy" anonymity, the open-science Data Availability statement, PACMSE publication, and desk-reject triage before the AoE cutoff.ȘtiințăFără avertismente★ 1,4 K↓ —
- eacl-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning an EACL project timeline through ACL Rolling Review, covering the single viable ARR cycle with no fallback, backward planning from the one deadline, the rebuttal window, the commitment decision to EACL, notification, and camera-ready through ACL Anthology publication, plus re-routing since the next chance is another conference.ProductivitateFără avertismente★ 1,4 K↓ —
- chi-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing an ACM CHI Papers submission for PCS readiness, covering the September full-paper deadline, the anonymized single-column template, word-count norms instead of page limits, subcommittee designation, supplementary and video upload, anonymization of external links, and CHI's desk-reject triage before upload.MediaFără avertismente★ 1,4 K↓ —
- cell-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when deciding which cell-* sub-skill to invoke next, or when sequencing a manuscript from significance test through reviewer rebuttal for Cell (Cell Press). Routes — it does not replace — the specialized skills.ProductivitateFără avertismente★ 1,4 K↓ —
- cikm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a CIKM project calendar across the May abstract/paper gates, June short-track gates, August notification and camera-ready, and the November conference, including the post-submission phase now live in the 2026 cycle, multi-track coordination, and fallback planning toward CIKM 2027 or sibling venues.ProductivitateFără avertismente★ 1,4 K↓ —
- colm-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLM submission campaign across the calendar — working backward from the late-March abstract and paper deadlines through the May-June rebuttal, July decisions, August camera-ready, and October conference, coordinating co-authors, compute, and reciprocal-reviewing duties, and slotting COLM into a multi-venue LM-research pipeline.ProductivitateFără avertismente★ 1,4 K↓ —
- corl-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a CoRL submission cycle end to end — the late-May abstract and paper deadlines, the summer review window, first-round rejection risk, the August one-page rebuttal and discussion period, autumn decisions, the October PMLR camera-ready, and the November conference — including what to do between milestones.ProductivitateFără avertismente★ 1,4 K↓ —
- add-pdf-viewermicrosoft/power-platform-skillsInternal implementation skill invoked by /add-native for native PDF control workflows. Handles HTTPS and file URI PDF viewing with @microsoft/power-apps-native-pdf-viewer 0.2.9+.DocumenteFără avertismente★ 1,1 K↓ —
- colt-workflowbrycewang-stanford/Awesome-Journal-SkillsUse when planning a COLT (Conference on Learning Theory) submission calendar backward from the single AoE paper deadline — proof-completion and verification milestones, writing and appendix-assembly passes, CMT logistics, the rebuttal window, decision aftermath, and PMLR camera-ready with conference presentation in early summer.ProductivitateFără avertismente★ 1,4 K↓ —
- cav-submissionbrycewang-stanford/Awesome-Journal-SkillsUse when auditing a CAV (Computer Aided Verification) submission for portal readiness, covering the four submission categories (Regular / Short Tool / Short Application / Industrial Experience & Case Studies), the LNCS page limits, the per-category anonymization matrix, the artifact-intent declaration, and desk-reject triage before the AoE paper deadline.ȘtiințăFără avertismente★ 1,4 K↓ —
write
hashgraph-online/awesome-codex-plugins
De la autor
Use for marketing, social, replies, product copy, launch copy, and writing in the user's voice when their Emulo writing profile should guide the task. Do not use for unrelated execution or UI/UX design alone.
Instalare
npx skills add hashgraph-online/awesome-codex-plugins --skill write -a claude-code
Se instalează în .claude/skills/write/ · Fiecare comandă descarcă skill-ul direct de pe GitHub cu utilitarul open source skills.
Identic octet cu octet cu commit-ul scanat, cu licența depozitului și un fișier SOURCE.txt.
La ce are acces
Verificări de siguranță pe SKILL.md
Niciun avertisment.
De ce 88
Fișiere (1)
- SKILL.md