analiza aiqbench
PowerAtlas represents a significant shift in AI infrastructure by treating data centers as flexible grid assets rather than static loads, directly addressing the volatility introduced by large-scale LLM training. This research demonstrates how integrating physical power constraints into scheduling algorithms can prevent line-flow violations while maintaining service-level agreements for computing tasks. By validating these methods on real-world utility data and releasing a new benchmark (ECBench), the work provides essential tools for aligning AI growth with grid stability.
PowerAtlas: Towards Electricity-Computing Co-Scheduling for Power Systems
arXiv:2607.26710v1 Announce Type: new Abstract: The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load. We present PowerAtlas, an LLM-agent framework for electricity-computing co-scheduling that integrates historical instances, domain knowledge, and physical constraints to produce joint decisions satisfying both grid operational rules and the service-level agreements (SLAs) of computing tasks. Working with a provincial power utility in China, we built an experimental electricity-computing network and validated the decision loop on real data-center data; from de-identified operational data we further constructed ECBench, a benchmark of 2,000 scheduling instances with oracle-optimal solutions. Experiments across eleven LLMs demonstrate the effectiveness of PowerAtlas under realistic physical operating conditions, with consistent feasibility and cost gains across three open-weight backbones. Our code is publicly available at https://github.com/JAVA-Jiang/PowerAtlas.
Abstract:The rapid growth of AI workloads is turning data centers into large-scale, volatile, yet spatiotemporally flexible grid loads, creating an urgent need for coordinated electricity-computing scheduling. Under stringent grid constraints, schedules from general-purpose large language models (LLMs) are often infeasible, causing line-flow violations and unserved load. We present PowerAtlas, an LLM-agent framework for electricity-computing co-scheduling that integrates historical instances, domain knowledge, and physical constraints to produce joint decisions satisfying both grid operational rules and the service-level agreements (SLAs) of computing tasks. Working with a provincial power utility in China, we built an experimental electricity-computing network and validated the decision loop on real data-center data; from de-identified operational data we further constructed ECBench, a benchmark of 2,000 scheduling instances with oracle-optimal solutions. Experiments across eleven LLMs demonstrate the effectiveness of PowerAtlas under realistic physical operating conditions, with consistent feasibility and cost gains across three open-weight backbones. Our code is publicly available at this https URL.
17 pages, 9 figures, 5 tables. Code: this https URL
Machine Learning (cs.LG)
arXiv:2607.26710 [cs.LG]
(or arXiv:2607.26710v1 [cs.LG] for this version)
https://doi.org/10.48550/arXiv.2607.26710 Focus to learn more arXiv-issued DOI via DataCite (pending registration)
arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.
Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.
Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.
Text integral sub licența deschisă a publicației · 258 cuvinte
Subiecte conexe
News Archive 2026
Quantum Computing Report · 25 iul. 2026

News
Quantum Computing Report · 7 iun. 2026

[AINews] not much happened today
Latent Space · 10 sept. 2026
SEMICON Taiwan 2026 Kicks Off: AI Chip Bottleneck Is Wires Connecting Them
techtimes.com · 31 aug. 2026