analiza aiqbench
This study introduces a novel, large-scale dataset that synchronizes Finnish railway operational metrics with meteorological observations to better model environmental impacts on transit reliability. By leveraging machine learning techniques like XGBoost regression, the research demonstrates significant utility for predicting station-specific delays and mapping infrastructure vulnerabilities in Nordic regions. The release of this resource provides researchers with a critical tool for advancing predictive models in transportation systems under varying weather conditions.
FI-TW: An Open Train-Weather Dataset for Railway Delay Analysis in Finland
arXiv:2601.16592v2 Announce Type: replace Abstract: Train delays result from complex interactions between operational, technical, and environmental factors. While weather impacts railway reliability, particularly in Nordic regions, existing datasets rarely integrate meteorological information with operational train data. This study presents the first publicly available dataset combining Finnish railway operations with synchronized meteorological observations from 2018-2024. The dataset integrates operational metrics from Finland Digitraffic Railway Traffic Service with weather measurements from 209 environmental monitoring stations, using spatial-temporal alignment via Haversine distance. It encompasses 28 engineered features across operational variables and meteorological measurements, covering approximately 38.5 million observations from Finland's 5,915-kilometer rail network. Preprocessing includes strategic missing data handling through spatial fallback algorithms, cyclical encoding of temporal features, and robust scaling of weather data to address sensor outliers. Analysis reveals distinct seasonal patterns, with winter months exhibiting delay rates exceeding 25\% and geographic clustering of high-delay corridors in central and northern Finland. Furthermore, the work demonstrates applications of the data set in analysing the reliability of railway traffic in Finland. A baseline experiment using XGBoost regression achieved a Mean Absolute Error of 2.73 minutes for predicting station-specific delays, demonstrating the dataset's utility for machine learning applications. The dataset enables diverse applications, including train delay prediction, weather impact assessment, and infrastructure vulnerability mapping, providing researchers with a flexible resource for machine learning applications in railway operations research.
Abstract:Train delays result from complex interactions between operational, technical, and environmental factors. While weather impacts railway reliability, particularly in Nordic regions, existing datasets rarely integrate meteorological information with operational train data. This study presents the first publicly available dataset combining Finnish railway operations with synchronized meteorological observations from 2018-2024. The dataset integrates operational metrics from Finland Digitraffic Railway Traffic Service with weather measurements from 209 environmental monitoring stations, using spatial-temporal alignment via Haversine distance. It encompasses 28 engineered features across operational variables and meteorological measurements, covering approximately 38.5 million observations from Finland's 5,915-kilometer rail network. Preprocessing includes strategic missing data handling through spatial fallback algorithms, cyclical encoding of temporal features, and robust scaling of weather data to address sensor outliers. Analysis reveals distinct seasonal patterns, with winter months exhibiting delay rates exceeding 25\% and geographic clustering of high-delay corridors in central and northern Finland. Furthermore, the work demonstrates applications of the data set in analysing the reliability of railway traffic in Finland. A baseline experiment using XGBoost regression achieved a Mean Absolute Error of 2.73 minutes for predicting station-specific delays, demonstrating the dataset's utility for machine learning applications. The dataset enables diverse applications, including train delay prediction, weather impact assessment, and infrastructure vulnerability mapping, providing researchers with a flexible resource for machine learning applications in railway operations research.
Machine Learning (cs.LG); Artificial Intelligence (cs.AI); Databases (cs.DB)
arXiv:2601.16592 [cs.LG]
(or arXiv:2601.16592v2 [cs.LG] for this version)
https://doi.org/10.48550/arXiv.2601.16592 Focus to learn more arXiv-issued DOI via DataCite
arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.
Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.
Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.
Text integral sub licența deschisă a publicației · 315 cuvinte
Subiecte conexe
RIDE: An Open Dataset and Benchmark for Train Delay Prediction
arXiv · 5 iun. 2026
Predicting Train Delays in Finland Using Machine Learning and Weather Data
arXiv · 12 sept. 2026
Predicting Delayed Train Trajectories on the Dutch Railway Network: Explainable AI Evaluation of Topological, Operational and Weather Features with Tree Based Ensemble Methods
arXiv · 30 sept. 2026
Controllable-CoT leads to covert reasoning capabilities
LessWrong · 22 sept. 2026